Kitchen cabinets

Setting up the new interior

Same as for the roof, I want light and bright surfaces
The walls are a bit skewed as well as bent outwards, the corner is somewhat 92°.
Gap will be adjuste with track saw for the countertops, for both directions.

Wanted to start by checking that CAD matches reality, started with prebuilding three cabinets to leans agains the walls

Where possible, blue protective film is left in place untill all is done.

-20241017


Just testing fitment, feet first.

The first impression is positive, it will be easily accesible and airy.


Big window is great for lighting.

 

-20241019

Mounted the first wall mount, checked level.
allowed for 9cm, bottom of cabinet to floor.

Extremely clear walls are not squared up.



Clearance for waterworks is ok.

 

-20241020

Measurements and cutouts for drain was done.


Drain has good clearance.

Built the top corner cabinet to testfit microwave oven


Somewhat hard to reach controls.

 

-20241023

Preparation for wire routing was done in several areas.
the top corner cabinet drilled with anglrd hole.
First row of panel.


Corrugated tubing channel.

Tube routed from back of cabinet.
Used a string wrapped around the tube, pulled it through
while lifting the cabinet in place.


Routing fits nicely.

-20241024

Time for drying cabinet.
The setup is typical for finnish style, cups and pplates etc. will be dried inside the cabinet, not the countertop.
Will definetly help with keeping clutter away.


Perfectly sized for 600mm cabinet.

Need to omit lowest part of cabinet to allow for ventilation,


Adding mounts.

On top, a vent is needed, want to keep dust out, så an overlapping mocdel was chosen


Hole needed, top of cabinet.


Some lines to cut.


Testfit with platter analog.

 

-20241027

To get the level correct-ish, modifications and custom made standoffs had to be made for all cabinets.


Customizing standoffs.

 

-20241029

A testmount of up to date build of cabinets.
The tiny inbetweeners can be bult now.


Time to add small cabinets.

 

-20241031

Three smaller cabinets to fill the gaps were built but these
can not be mounted on the wall rails, they need to be directly
screwed into the side cabinets.


Tightening the cabinets.


This tiny tool is excellent.


Aligning with quick clamps

 


The refrigerator sidewall can be added.

 

-20241103

Adding the oven and the oven drawer showed clearance issues with electrical outlets.
Time to call the electrician.


Top view.


Clearance mesured.


Perilex clash with drawer.

Besides clashing connectors, side cover panels were test mounted.


Side panels and doors mounted.

Time to leave the house for the winter. no more can be done for this year.
Snow storms are approaching.

 

-20250421

Back from a snowy winter, water heater cabinet is built
A supporting plate is added to the wall secured by several screws.


Securely mounted.

 

-20250426

Connected all tubes and hoses, tigthened all joints and mounted the cabinet to the sidewall and rail.


So far as possible, pipes tightened.

An assortment of wood pieces were cut to be used below countertop.


Corner to stove, check.


Stove front, check.


Stove from wall, check.


Sink from wall, check.

 

-20250427

Added some panels and doors. cleaned the entire workplace for the next stage.
Counter tops can now be cut and installed


Time for countertops.

 

-20250511

A lesson learned, adding bumpstops to cabinets was not so
useful in the long run.

The backwards leaning if all surfaces that I tried to save with wood pieces was not remotely the correct way to adjust the countertops.

I suspected the lower bumpstops and perhaps the awkward, outward bending of the window wall caused a lot of issues.

All has to be removed, bumpstops deleted and height/distance to wall for the window wall rail needed, also some level adjustements
has to be done.



Sides, stove, removed.


Corner cabinet removed.

 

bumpstops deleted, need to see if anything needs to be used as substitution.


All bumpstops removed.

 

The rail can be offset bfrom the wall with wooden pieces.


First corner wall cabinet adjustment.


Not excessively pushed out.

It is all now level without wooden standoffs, now it is hanging on the rails but only supported by the front feet on the cabinets.
Perhaps need to create wooden wedges.

Additionally, A new toy has been picked up


Unboxing

Perhaps now it is time for countertops.

 

-20250517

Helpful worktable built using simple components was prepared in the
yard.


A wooden worktable.


Firstly, saw need to be mated to rail.

 


Secondly, the first cut.

Board cut to size, there was no need to angle the cut closest to corner.


Seems to fit ok.

Sink placed to bench, placed upside down on masking tape.
Measurments were stated in documentation, heed taken to tubing and pipes underneath and also the faucet installation depth.



Upside down sink.


Masking tape marked, inside outline.

Stove countertop cut to size. no angled cut to compensate for warped walls.
instead hoping that kitchen tiling will hide it.


Induction stovetop marked.


Marking is clear for sink.


Marking is clear for stovetop.

 

Time for plungecutting, corners drilled only for Induction stovetop
(following instructions).


Plunge saw with chip guard.



Inside of marking is cut


Cut and saw.



Be careful lifting the weakened wood


testfit ok.

 

 

-20250524

The two pieces are joined with TEC-7, using the clamps and the wood from the corner cabinet to level the surfaces.


Glue and clamps ready.


Pressure on and screws to drill


Needed ballast for the inner ones


Secured and glued.

 

-20250525

Faucet can now be dropped into place and threaded with tools that were
in the same packaging.

Before that copper pipe is cut to length (water works)


Depthcheck for faucet.


Bitumen padds attached.




Sink dropped in place.

Time's up for today, adding putty to tubes in a few days.

 

-20250531

Water tubes connected, hoses in place.
time to pressuretest. (water works)


Time to build som shelves.


 

-20250607

Used the plunge saw to make cuts that helps the side panels align with the floor.
The house is old, all floors lean into center of the room.


adding the side cover.


Finishing piece made from two parts


Moved the fridge into place.

-20250622

Took a lot of time just to build som shelves and add som doors



Marking the cabinet doors and shelves.

 

-20250629

Softstarted the kitchen, had a few people over for an evening of BBQ.
One issue presented itself with the drying shelves being in the wrong order.

While rearranging them, I opted to finilize the water protection and the edge strips.

Moved the holes 85mm downwards for the top level
bottom is ok.



Shelves are in the wrong order.

 

TEC-7 and platic strips to be added.
First, two pieces need to be cut to length.

Simple trick to get the right lengths is using masking tape.


Masking tape with glue outwards.


Streching the strip over tape.


Masking tape shows where to cut.


Thoroughly massage in the glue


thoroughly press and roll the strips.

Added the shelves and now it is time to let the glue cure.


Reordered shelves.

 

-20250707

Nothing special, just added a grille to refrigerator top vent.


Ribbed

 

-20250810

Started the induction stove for the first time, the warning label should have been a bit more clear that the smell of burnt electronics would be that strong.
Removed it from the countertop and ran it full blast outdoors.

This also made it clear that running the oven at the same time was very bad due to very limited ventilation. approx 10mm clearance, the oven gets very hot.


"burn in"

 

Added som trash bin rails, nice feature.


Trash rails

Ordered a new setup with blind front and lowering of the oven some 10cm.
Will have to update the
installation at later date.
Currently it is not recommended running the induction stove and oven at the same time.

 

 

-20250815

Removed induction stove with oven in place, the bad clearence is visible, barely 1cm for air circulation.


Hot metal when oven is on.

Assembled the lower drawing to get the height for the oven, the space seems to work with a few millimeters to spare.


new lower drawing.

The stove needs air from its own inlet, cutting the back panel.
Adding a divider that will be pushed all the way back to prevent heated air from the oven to creep up towards the fans.


Air gap

This new gap allows for the cable to be dropped down the back
of the cabinet.


Cable routing.

The divider is IKEA nyttig, it is mounted on slides, adding a piece to the end of it to extend it bit.

leaving a gap in front, hopefully this will push som air below the divider as well as out from the gap in front under the counter.


Nyttig 102.432.96


Adding extension.


Mounted with a little gap.


View from below.


View from the front.

Started the oven and cooked some water on the stove.
No smell of heated parts nor electronics.
there was a gentle breeze leaving the front of the countertop.
Going to test it again, now it is time to close for the day.

TBC

-20250816